MACQUARIE UNIVERSITY
The Incubator
The Macquarie University Incubator was designed to respond to the diverse and changing needs of its occupants, as well as three key aspects that informed the design of the space; a relocatable building, a limited budget and a short time frame for its implementation. Timber was selected as the main construction material for its capacity to be beautifully engineered, swiftly fabricated to high quality, and for its potential for future dis-assembly and relocation, with the majority of components prefabricated offsite to ensure rapid construction on site and minimal disruption to the concurrent university semester. The resulting building was completed within five months of construction commencing.
It is multi-award winning – 14 global design and construction awards. Since being officially opened in 2017, Macquarie University’s iconic Incubator building has won the following awards:
World Architecture News Awards
Highly Commended Wood in Architecture, 2018
Australian Institute of Architects
National Award for Educational Architecture, 2018
The Chicago Athenaeum Museum of Architecture and Design
International Architecture Award, 2018
Architecture & Design Sustainability Awards
Sustainability Award, Education and Research, 2018
Australian Institute of Architects (NSW)
William E Kemp Award for Educational Architecture, 2018
Sustainable Architecture Commendation, 2018
Learning Environments Australasia
Excellence in Educational Facilities Awards, Category 2, New Construction / New Individual Facility over $8m, 2018
Excellence in Educational Facilities Awards, Overall Winner, 2018
Good Design Awards®
Architectural Design, 2018
INDE.Awards
The Learning Space, 2018
Property Council of Australia Innovation and Excellence Awards
Award for Project Innovation, Finalist, 2018
Chicago Athenaeum, Green GOOD DESIGN Awards
Research and Technology, 2018
Association of Consulting Structural Engineers NSW
Medium Building Projects Award, 2018
Australian Timber Design Awards
Excellence in Timber Design – Innovative Structural Design, 2017
Consultants Involved
Architectus: Principal Consulting Architect
Arup: Engineer
Lipman: Main Contractor
Timelapse of the construction
Maquarie University Incubator - August 2017
Construction by LIPMAN PTY LTD
View the links below to view more on this project
https://architectus.com.au/projects/macquarie-university-incubator/
https://lipman.com.au/projects/macquarie-uni-the-incubator-2/
https://www.arup.com/projects/macquarie-university-incubator